GRP WATER TANK

Technology & Innovation
HAYOUNG Corporation
line

CAUTION

INSTALLATION SCOPE

Base Concrete Pad

– Customers are requested to make base concrete according to the designed spcifications and the strength of the site.
– Anchor bolts are to be fixed by out agents.
– The required strenght of the base concrete must be at leat 180kg/c㎡ and the thickness of mortar on the base concrete must not exceed 20mm.

The Extent of Installation Work

– If the customer designates the size of nozzles for plumbing, our agents will install the nozzles.
– After the nozzles are in place, the plumbing and teat insulation for the nozzles part must be done by customer.

Installation Space

– It is recommended to leave a space of 600㎜ in each direction from the tank for maintenance.

INSTALLATION CAUTION

Transportation

Do not place heavy loads or force on the panels during the transportation.
Those parts that are touched with rope or other cargo must be cushioned.

The Extent of Installation Work

– Be careful not to put any heavy weight on the pipes that are connected to the fitting
– pipe installation must be started from the water tank side and be careful not to put unbalanced weight on the nozzle.
-Take precautions to avoid fire or other occurrences / accidents while welding.

Maintenance

If is not used for a long time, be sure to drain the water from the tank.
As the tank is a reservoir of water for consumption by people, regular inspection should be done for safety.
(more than twice a year)